Downtown Los Angeles Streetcar Alternatives Analysis to be reviewed by Metro Board
The Alternatives Analysis for the downtown Los Angeles streetcar project was released back in January, with the above route chosen as the “locally preferred alternative (LPA).” The study is going to the Metro Board as a “receive-and-file” item this month — meaning that no action is required — and I [continue reading]