Published February 10, 2016 at 1654 × 1243 in Regional Connector Little Tokyo update: paving, potholing and pouring concrete‘potholing pile trenching at 1st Alameda’ Potholing and pile trenching at 1st and Alameda to support future shoofly track junction. Like this:Like Loading... ‹ Back