The Mulholland Bridge over the I-405 — made infamous by Carmageddon I and II — will be fully closed tonight (7/25) so that the deck can be resealed to coat some non-structural cracks that were discovered during routine inspection. The resealing will help ensure the long life of the surface.
Tonight’s closure will begin at 10 p.m. and last until approximately 8 a.m. Saturday. It will be followed by four nights of lane reductions — but not fully closures — Saturday (10 p.m. to 8 a.m.) through Tuesday nights (10 p.m. to 6 a.m. Sunday, Monday, Tuesday).
Categories: Service Alerts, Transportation News
[…] Closure Due To Unexpected Cracks on 405′s Mulholland “Carmageddon” Bridge (The Source) […]