Upcoming closures for I-10 HOV project

Caltrans will close portions of the I-10 as part of the High Occupancy Vehicle lane construction project.

The following schedule will be in effect, weather permitting, and is subject to change:

Continuing Long Term Closure

Bess Avenue Pedestrian Overcrossing

Full closure of Bess Avenue pedestrian overcrossing through summer, 2013                                 

Extended 55-Hour Closure

Friday, September 13 at 10 p.m. through Monday, September 16 at 5 a.m.

  • Eastbound I-10 Frazier Street off-ramp
  • Northbound I-605 to eastbound I-10 connector
  • Southbound I-605 to eastbound I-10 connector                                  

Friday, September 13

  • 10 p.m. to 10 a.m. – One lane of eastbound I-10 between I-605 and Baldwin Park Boulevard.
  • 10 p.m. to 5 a.m. – Eastbound I-10 connector to northbound I-605
  • 11:59 p.m. to 6 a.m. – Northbound I-605 connector to westbound I-10

Saturday, September 14

  • 10 p.m. to 10 a.m. – One lane of eastbound I-10 between I-605 and Baldwin Park Boulevard.

Sunday, September 15                                               

  • 10 p.m. to 5 a.m. – One lane of eastbound I-10 between I-605 and Baldwin Park Boulevard.  

Monday, September 16 through Thursday, September 19

  • 8 p.m. to 6 a.m. – Southbound I-605 connector to eastbound I-10.
  • 7 p.m. to 6 a.m. – Northbound I-605 connectors to I-10.
  • 8 p.m. to 5 a.m. – Northbound I-605 Valley Boulevard on-ramps.

Westbound I-10

  • 9 a.m. to 3 p.m. – Frazier Street. Baldwin Park Boulevard and Francisquito Avenue on- and off-ramps.
  • 9 p.m. to 5 a.m. – Up to 3 lanes from Puente Avenue to I-605.
  • 11 p.m. to 4 a.m. – Full freeway closure from Puente Avenue to I-605.
  • 9 p.m. to 5 a.m. – Connector to I-605.
  • 7 p.m. to 6 a.m. – Frazier Street, Baldwin Park Boulevard, and Francisquito Avenue on- and off-ramps.
  • 9 p.m. to 6 a.m. – Puente Avenue on-ramp.

Eastbound I-10                                                           

  • 9 a.m. to 3 p.m. – Baldwin Park Boulevard on- and off-ramps.
  • 10 p.m. to 6 a.m. – Up to 3 lanes from I-605 to Puente Avenue.
  • 1 a.m. to 5 a.m. – Full freeway closure from I-605 to Puente Avenue.
  • 9 p.m. to 6 a.m. – Connector to northbound I-605.
  • 9 p.m. to 6 a.m. – Durfee Avenue on-ramp.
  • 8 p.m. to 7 a.m. – Frazier Street off-ramp. 
  • 7 p.m. to 6 a.m. – Baldwin Park Boulevard on- and off-ramps.
  • 10 p.m. to 6 a.m. – Francisquito Avenue off-ramp.

Flatiron West, Inc. is the contractor on this $165 million project, which will add an HOV lane in each direction of I-10 between I-605 and Puente Avenue. Detour signs will be posted to direct motorists. Anticipated completion is fall, 2013. Caltrans reminds you to “Slow For the Cone Zone”