This is it — the last work before Carmageddon next weekend. Traffic is being shifted over to the rebuilt south side of the Mulholland Drive Bridge over the 405 freeway in order to prepare for the demolition of the north side next weekend.
Here’s the construction notice:
Categories: Service Alerts