The refinements in the report involve the alignment of the proposed tunnels through Little Tokyo. The memo from the project team:
Metro is currently circulating the Supplemental Environmental Assessment/Recirculated Sections of the Draft Environmental Impact Report (Supplemental EA/Recirculated Draft EIR Sections) presenting information on the refinements to the Locally Preferred Alternative (LPA) for the Regional Connector.
You are invited to review and comment on this document. The 45-day public review and comment period for the Supplemental EA/Recirculated Draft EIR Sections began on July 22, 2011 and will end September 6, 2011.
A copy of the Supplemental EA/Recirculated Draft EIR Sections is available at metro.net/regionalconnector and at public libraries in the study area. For a full listing of these libraries, please visit the project website at metro.net/regionalconnector.
You may submit your comments as follows:
• By e-mail to: regionalconnector@metro.net
• By US Mail to: Ms. Dolores Roybal Saltarelli, Project Manager, Metro, 1 Gateway Plaza, MS 99-22-2, Los Angeles, CA 90012
• By going to our website at metro.net/regionalconnector and clicking on “Contact Us”
Many thanks for your ongoing interest in the Metro Regional Connector.
Categories: Projects