For a complete list of planned service advisories please visit the Service Advisories page on Metro.net. And for the latest service alerts follow @MetroLAalerts on Twitter.
Blue Line
After 8:15pm, Blue Line trains run every 30 minutes due to construction work for the future Expo Line. Please see schedule here.
Dates: through Tuesday.
Gold Line
At Soto Station, due to necessary elevator maintenance work, the elevator located between the platform and mezzanine level will be out of service beginning 7am Monday and return to service on Tuesday.
Affected passengers are advised to use the Mariachi Plaza Station and eastbound Line 30 towards Indiana Station to complete their trip.
Dates: through Tuesday.
Green Line
Due to track maintenance between 9:15am and 2:00pm, Eastbound trains to Norwalk will leave 10 minutes later than regular schedule.
- Eastbound trains to Norwalk will depart Redondo Beach at 9:21am, 9:40am, 9:59am, 10:14am, 10:29am, 10:44am and every 15 minutes through 1:59pm, then 2:09pm and resume regular schedule.
- Westbound trains to Redondo Beach will depart Norwalk on regular schedule.
- During this time, trains in both directions will share ONE track at Hawthorne Station. Please check train destination signs and station announcements before boarding.
Dates: through Thursday.
Line 105
Due to street paving the listed line will be on detour between between San Vicente Blvd. & La Cienega Blvd.
Northbound: Regular route to La Cienega Blvd. and Beverly Blvd., then continue via La Cienega Blvd., to (L) Melrose Ave., (R) San Vicente Blvd., (R) Division 7 and regular route.
Southbound: Depart the layover Five (5) minutes after scheduled departure time via (L) San Vicente Blvd. (L) Melrose Ave. (R) La Cienega Blvd. and regular route.
Dates: 8am-5pm, through Thursday.
Categories: Transit Forecast