Daily transit forecast for Friday, Nov. 19; Blue Line bus bridge again this weekend due to Expo Line construction

For a complete list of planned service advisories please visit the Service Updates page on Metro.net. And for the latest service alerts follow @MetroLAalerts on Twitter.

Blue Line

Due to Blue Line/Expo Construction, beginning at 8:30pm Friday and through at least 4am Monday morning, trains will operate only from Washington Station to Long Beach Transit Mall.  Trains will operate on regular schedule.  Shuttle Buses will operate between Washington Station and 7th/Metro Center.  Please be advised to allow up to 40 additional minutes to complete your trip and that work will occur over additional weekends; notices will be posted.  Please see metro.net for more information.  Metro apologizes for the inconvenience.

Shuttle Bus boarding locations:

Northbound to Los Angeles

Washington – Long Beach Ave. Northbound Roadway, south of Washington Blvd.
San Pedro – Washington Blvd, east of San Pedro St.
Grand – Washington Blvd., east of Olive Ave.  (in front of McDonald’s)
Pico – Pico Blvd., east of Flower St.
(Buses will continue to 7th St./Metro Center Station to connect with Red / Purple Line trains and Metro buses.)

Southbound to Long Beach

7th St./Metro Center Station – Hope St., north of 7th St. (Hope St. Station exit).
Pico –Pico Blvd., east of Flower St.
Grand – Washington Blvd., east of Grand Ave.
San Pedro – Washington Blvd, east of San Pedro St.

Categories: Service Alerts, Transit Forecast

Tagged as: