Drill Rig Crosses I-210 FW Published October 3, 2011 at 3872 × 2592 in Iconic bridge starting to shape up for Foothill Extension Gold Line The SR 100 Soilmec Drill Rig makes its way across the eastbound 210 last month to complete the foundations for two of the bridge’s three abutments. Share the Source: