Future-IFS-Location-41-467×348 Published July 5, 2011 at 467 × 348 in Construction scheduled to begin tonight on bridge over 210 for Gold Line Foothill Extension An aeriel rendering of the new bridge for the Foothill Extension. Share the Source: