mblTangle Published December 20, 2010 at 300 × 185 in Expect 25-minute delays on Blue Line; damage to overhead wires stalls train at Gage Ave. crossing Blue Line train stalled by damage to overhead catenary wires sits on overhead bridge about 100 yards south of Slauson Station. Photo by Luis Inzunza Blue Line train stalled by damage to overhead catenary wires sits on overhead bridge about 100 yards south of Slauson Station. Photo by Luis Inzunza Share the Source: